Silver Lake Rod & Gun Club
Committee Meeting
August 1, 2022
Committee Meeting
August 1, 2022
CALL TO ORDER
Meeting called to order at 7:15 by Club President Fred Guyette.
Purpose of the meeting; Discuss BBQ Pit with quotes and vote
Attendance;
Fred Guyette, Lori Raub, Bob Kuhn, Jim E. Mayers, Jim C. Mayers, Ron Walter, Clark Burr, Bob Tucker, Dave Shaffer, Mike DePaola, Dan Hungerford.
It was determined that Zeb, Todd and Evan Everitt will pour the 10’ x 20’ slab.
Dave Shaffer to do the excavating for the slab.. Rip Van Winkle to deliver a load of #2 stone and a load of 1 minus stone.
A two door refrigerator to be supplied by Tom Ellis. Cost $3,830.00. Installed and set up. (see quote attached.) It was noted that John Marconi has offered to pay ½ of the refrigerator cost.
New Milford Hardware provided a material quote to Zeb Raub. Material cost is $3,320.07. (See quote attached.)
It was further noted that the cost for concrete will be approximately $1,000.00. Electrical work estimated to be approximately $1,000.00.
It was further determined that the total cost shall not exceed $8,000.00.
Motion by Fred to proceed at the NTE cost of $8.000.00. Motion 2nd by Jim Mayers. All approved.
Work to be completed by this Fall.
Discussed adding the following as Honorary Members;
Motion to accept those listed as Honorary Members made by Fred Guyette. Motion 2nd by Jim Mayers, All approved.
Meeting adjourned at 9:15.
Respectfully submitted,
Jim Mayers, Secretary
Meeting called to order at 7:15 by Club President Fred Guyette.
Purpose of the meeting; Discuss BBQ Pit with quotes and vote
Attendance;
Fred Guyette, Lori Raub, Bob Kuhn, Jim E. Mayers, Jim C. Mayers, Ron Walter, Clark Burr, Bob Tucker, Dave Shaffer, Mike DePaola, Dan Hungerford.
It was determined that Zeb, Todd and Evan Everitt will pour the 10’ x 20’ slab.
Dave Shaffer to do the excavating for the slab.. Rip Van Winkle to deliver a load of #2 stone and a load of 1 minus stone.
A two door refrigerator to be supplied by Tom Ellis. Cost $3,830.00. Installed and set up. (see quote attached.) It was noted that John Marconi has offered to pay ½ of the refrigerator cost.
New Milford Hardware provided a material quote to Zeb Raub. Material cost is $3,320.07. (See quote attached.)
It was further noted that the cost for concrete will be approximately $1,000.00. Electrical work estimated to be approximately $1,000.00.
It was further determined that the total cost shall not exceed $8,000.00.
Motion by Fred to proceed at the NTE cost of $8.000.00. Motion 2nd by Jim Mayers. All approved.
Work to be completed by this Fall.
Discussed adding the following as Honorary Members;
- Caden Dearborn, Brackney, PA
- Art Ruck, Binghamton, NY
- Brad Hitchcock, Montrose, PA
- Phylis Rought, Montrose, PA
- Pat McPherson, Vestal, NY
- Reggie Raynor, Montrose, PA
- Tom Ellis, Johnson City, NY
Motion to accept those listed as Honorary Members made by Fred Guyette. Motion 2nd by Jim Mayers, All approved.
Meeting adjourned at 9:15.
Respectfully submitted,
Jim Mayers, Secretary